Welcome Kenya Railways Corporation

The Kenya Railways Corporation was established by an Act of Parliament (Cap 397) of the Laws of Kenya, and commenced operations on January 20, 1978. The overall mandate of the Corporation then was to provide a coordinated and integrated system within Kenya of rail and inland waterways transport services and inland port facilities.
The Act was amended through The Kenya Railways (Amendment) Act 2005 to make it possible for the Board of Directors to enter into concession agreements or other forms of management for the provision of rail transport services. Following this Amendment, KR conceded railway operations to Rift Valley Railways Ltd (K) from November 1, 2006 for 25 years for freight services and 1 year for passenger services.

Dignitaries waiting for the H.E. the President of Kemya
Arrival of H.E. the president
Signing of the Visitors book
The Ag. MD takes H.E. through the project
Knowing the difference between Standard Gauge Rail and Metre Gauge Rail
Knowing the difference between SGR and MGR
Knowing the difference between SGR and MGR
The Height SGR will reach
Tightening the first nut on the SGR
Official Launch of SGR
Group Photo
Entertainment by Railway Training Institute choir
speech by H.E. the Deputy President
The media houses present at the event
Speech by H. E. the President
a gift for H.E. The President
H.E. recieves the spanner used to tighten the first nut of the SGR on the official launch at Changamwe

Kenya Railways (KR) is mandated to promote, facilitate and participate in the National and Metropolitan Railway development. In this regard, KR is currently involved in the following initiatives:

  •  Developing a Standard Gauge Railway network within the country and connected to neighbouring countries
  • Developing rail commuter services within and around major towns in Kenya (Nairobi, Mombasa, Nakuru, Eldoret and Kisumu).

The Railway Network in Kenya
The current rail network in Kenya is the metre gauge commonly referred to as ‘The Lunatic Line’. It was initially named the ‘Uganda Railway’ after its destination. Its construction began in the Port city of Mombasa in 1896 and was completed in 1901 at the lines terminus in Kisumu. Operations on the line commenced in 1903. The Lunatic Line links Kampala in Uganda with the Indian Ocean town of Mombasa.

Branch lines were built to Thika in 1913, Lake Magadi in 1915, Kitale in 1926, Naro Moru in 1927 and from Tororo to Soroti in 1929. In 1929, the Uganda railway became Kenya Uganda Railways & Habours. In 1931, a branchline to Mount Kenya was completed and the main line was extended from Nakuru to Kampala in Uganda.

The line is 1,000 mm and is a single track all through with occasional sidings and passing points to deal with opposing traffic. Construction was carried out by labourers brought in from India. After completion, some of the Indians remained behind thus creating the Indian community in East Africa.

The line was a huge logistical achievement and became strategically and economically vital for Kenya, linking the Indian Ocean with Lake Victoria and the East African interior. Branch lines were built and the railway became an essential part of safari adventures in the early decades of the 20th Century.

Concession of the Kenya Uganda Railways

Recognizing the historical links between Kenya Railways and Uganda Railways, the mutual dependency of the railways on each other and the potential benefits to be derived by concessioning the railways jointly, in June 2003, the Governments of the two countries made a strategic decision that Kenya Railways (KR) and Uganda Railways (UR) should be concessioned jointly.

On 1st November last year, Rift Valley Railways (K) took over passenger and rail transport services for a period 1 year (renewable) and 25 years respectively from Kenya and Uganda Railways.

RVR is currently undertaking a number of initiatives aimed at improving quality of service and increase hauling capacity. The initiatives include:
• Acquisition of a tamping machine and a ballast regulator. These are high performance, fully automated equipment that will boost track maintenance and rehabilitation
• Acquisition of a new fleet of 20 locomotives from General Electric in the US.
• Installation of Global Positioning System based software on trains. This allows online visualization of train movement from an operations control center in Nairobi.
• Use of train simulators to train locomotive drivers;
• Locomotives and wagon overhaul and rehabilitation;
• Culverts replacement and track rehabilitation.

 

Like us on Facebook

Latest News

RVR to transform rail transport in the region

 

Rift Valley Railways (Kenya - Uganda Concessionaire) is currently undertaking a number of initiatives aimed at improving rail transport services in the country.

 The firm is now able to determine the [more]

KRC to reclaim railway reserve land

 

Plans to move encroachers out of the railway wayleave also known as the Railway Reserve Land are underway. Presently, encroachment prevails on many sections of the reserve land thereby hampering [more]